| Table No. 3-H Grading Permit Fees* |
Administering Department: Planning & Inspection
tel: (408) 615-2420 fax: (408) 241-3823 |
| |
| 100
cubic yards (to 76.5 m3) or less |
$37.00 |
| 101
to 1,000 cubic yards (77.2 to 764.6 m3) |
$37.00 for the first 100 cubic yards (76.5 m3) plus $17.50
for each additional 100 cubic yards (76.5 m3) or fraction
thereof.
|
| 1,001
to 10,000 cubic yards (765.3 to 7645.5 m3) |
$194.50 for the first 1,000 cubic yards (764.6 m3), plus
$14.50 for each additional 1,000 cubic yards (764.6 m3) or
fraction thereof.
|
| 10,001
to 100,000 cubic yards (7646.3 to 76 455 m3) |
$325.00 for the
first 10,000 cubic yards (7645.5 m3), plus $66.00 for each
additional 10,000 cubic yards (7645.5 m3) or fraction thereof.
|
| 100,001
cubic yards (76 456 m3) or more |
$919.50 for the
first 100,000 cubic yards (76 455 m3), plus $36.50 for each
additional 10,000 cubic yards (7645.5 m3) or fraction thereof. |
| |
| Other
Inspections and Fees |
| 1. |
Inspections
outside of normal business hours (minimum charge -- two hours) |
$300.00** |
| 2. |
Reinspection fees
assessed under provisions of Section 305.8 |
$80.00 per hour |
| 3. |
Inspections for
which no fee is specifically indicated (minimum charge--one-half
hour) |
$80.00 per hour |
| |
| * The
fee for a grading permit authorizing additional work to that
under a valid permit shall be the difference between the fee
paid for the original permit and the fee shown for the entire
project. |
| |
| ** Or
the total hourly cost to the jurisdiction, whichever is the
greatest. This cost shall include supervision, overhead, equipment,
hourly wages and fringe benefits of the employees involved. |
| |
|
| |
| [ More Links ] |
Building
Permit Fees
Table No. 3-A Building Permit Fees
Table No. 3-B Electrical
Permit Fees
Table No. 3-C Mechanical
Permit
Table No. 3-D Plumbing
Permit Fees
Table No. 3-G Grading Plan
Review Fees
|
| |
| |
| |