Skip to page body Home Residents Business Goverment Services About
Contact Us

Christopher L. de Groot
Director of Water & Sewer Utilities

Email: Water & Sewer
Telephone: 408-615-2000
Fax: 408-247-0784

OFFICE HOURS
Monday - Friday
8:00A - 5:00P

ADDRESS
1500 Warburton Avenue
Santa Clara, CA 95050

Contact Us

Christopher L. de Groot
Director of Water & Sewer Utilities

Email: Water & Sewer
Telephone: 408-615-2000
Fax: 408-247-0784

OFFICE HOURS
Monday - Friday
8:00A - 5:00P

ADDRESS
1500 Warburton Avenue
Santa Clara, CA 95050

Current Construction Activities

The following is a list of current construction projects performed by Water & Sewer Utilities crews.

If you have any questions about the project, call the Water & Sewer Utilities at 408-615-2000. ________________________________________________________________________________________________________________

El Camino Homes Water Main Replacement Project
The City of Santa Clara Water and Sewer Utility is dedicated to maintaining a “state of the art” potable water distribution system through various upgrade projects throughout the year.
As an example, the El Camino Homes in a neighborhood located near Scott Blvd. and El Camino Real, the City is replacing 1.4 miles of water main that provide water to over 150 single family homes and a shopping center. 

 

2014-ECR-Center-Main-Replacement-F3

 

2014-ECR-Center-Main-Replacement-F2

 2014-ECR-Center-Main-Replacement-F1

Northside Tanks Rehabilitation Project (WA 30124)
Northside Tanks 1 and 2, are above ground welded steel storage tanks built in 1978 and 1984 respectively with a capacity of 4.7 million gallons each. The original coatings of these tanks have reached the end of their useful lives and are in need of rehabilitation. The project scope of work includes abrasive blasting and recoating the interior and exterior of the tanks coupled with upgrades to the tanks to meet current health and safety standards. The rehabilitation of Northside Tank 2 was completed in spring 2014 and has been back in service, while the construction work is ongoing on Northside Tank 1.

 2014-Northdie Tank#1 Fig3 2014-Northdie Tank#1 Fig1
 2014-Northdie Tank#1 Fig3 2014-Northdie Tank#1 Fig2 

 

Central Park Pond Improvements Project (WA 7506)
The Central Park Pond is an important visible feature of the City’s Central Park, which is a venue of several high profile events including the Arts and Wine Festival, Silicon Valley BBQ Championships and international swim meets. To improve the water quality of the pond, a two-stage upflow wetland treatment system was installed. In addition, the pond’s source water was converted from potable water to recycled water. The project was a successful joint effort between the City’s Water & Sewer Utilities and Parks & Recreation Departments, and was completed in early summer 2014.   

 2014-Central-Pond-F2 2014-Central-Pond-F3

 

 2014-Central-Pond-F4 2014-Central-Pond-F5   

Last updated: 11/19/2014 8:21:55 AM