City of Santa Clara
Menu49ers Stadium DEIR
Draft Environmental Impact Report (DEIR)
49ers Proposed Stadium, 4900 Centennial Boulevard
- 49ers Proposed Stadium DEIR Text (15MB PDF)
- A – FAA Determinations of No Hazard (5.6MB PDF)
- B – Geotechnical Reports (16.1MB PDF)
- C – Burrowing Owl Survey (71KB PDF)
- D – Tree Surveys (10MB PDF)
- E – Hazardous Materials Users Survey (10MB PDF)
- F – Phase 1 Environmental Site Assessment (3MB PDF)
- G – Accidental Release Assessment (1.5MB PDF)
- H – Transportation Impact Analysis (11.1MB PDF)
- Transportation Impact Analysis Technical Appendices (16.3MB PDF)
- I – Transportation Management Plan (6.6MB PDF)
- J – Air Quality Analysis (2MB PDF)
- K – Noise Assessment (6.2MB PDF)
- L – Water Supply Assessment (8.4MB PDF)
- M – Sanitary Sewer Capacity (171KB PDF)
- N – Greenhouse Gas Emissions (935KB PDF)
- O – Notice of Preparation (NOP) and NOP Comment Letters (5.2MB PDF)
Last Updated:
03-22-2019